Completed projects
Railways
- Electrification of Volkhovstroy – Svir (length 165 km)
- Electrification of Byelomorsk – Sumposad – Malenga (length 128 km)
- Electrification of Petrozavodsk – Svir (length 270 km)
- Electrification of Idel – Svir (length 435 km)
- Electrification of Volkhovstroy – Costa (length 350 km)
- Reconstruction of a high-speed trains of the St. Petersburg – Moscow (length 650 km)
- Reconstruction of a high-speed trains of the St. Petersburg – Buslovskaya (length 157 km)
- Electrification of the Mga – Gatchina – Ivangorod (length 191 km)
- Electrification of Sizran – Sennaya (length 178.9 km)
- Elektrifikatsiya of Yaiva – Solikamsk, bypassing the station Bereznyaki (length 53 km)
- Electrification of Karymskaya – Zabaykalsk (length 366 km)
- Electrification of Tuapse – Adler – Alpika Service (length 150 km)
- Electrification of Bikin – Sibirtsevo (length 461 km)
- Electrification of Khabarovsk – Ussurijsk (length 112 km)
- Ussurijsk – Sibirtsevo (length 600 km)
- Electrification of Losevo – Kamenogorsk (length 68 km)
- Elektrifikatsiya of Nizhny Novgorod – Petushki (length 250 km)
- Reconstruction and electrification of the Moscow Ring of Moscow railway (length 53 km)
- Organization of intermodal transport from the Kazan railway station to Kazan International Airport
- Integrated development line Mezhdurechensk - Taishet
Undergrounds
-
Kazan Metro
- The line «Koziya Sloboda – Prospekt Pobedy» - the first step of the first line
- The line «Koziya Sloboda – Zavodskaya» - the second step of the first line
-
Petersburg Metro
- The line «Sadovaya – Komendatsky Prospekt» line 5
- The line «Sennay Ploschad' – Parnas» line 2
- The line «Sadovaya – Mezhdunarodnaya» line 5
-
Moscow Metro
- The line «Marino – Zyablikovo» Lublino-Dmitrievskaya line
- The line «Volokolamskaya – Mitino» Mitino-Stroganovskaya line
- The line «Trubnaya – Marina Rosch'a» Lublino-Dmitrievskaya line
- The line «Novogireevo – Novokosino» Kalininskaya line
- The station «Piatnickoe Shosse» Arbato-Pokrovskaya line
- The line «Krasnogvardeiskaya – Alma-Atinskaya» Zamoskvoretskaya line
- The line «Vyhino – Zhulebino» Tagansko-Krasnoprevskaya line
- The line «Ugo-Zapadnaya – Troparevo – Rumyantsevo – Solntsevo» Sokolnichevskaya line
-
Novosibirsk Metro
- The line «Sibirskaya – Zolotaya Niva» Dzerzhinskaya line
-
Samara Metro
- The first step of the fifth starting comples «Alabinskaya» station
Industrial electric transport
- The traction substation of Pikalevo Alumina Plant
- The traction substation Engels Locomotive Factory
Generation and distribution of electric power
- The substation No 40A, Lenenergo
- The substation No 109A, St. Petersburg Electric Networks
- The substation No 160, Lenenergo
- The substation No 161, Lenenergo
- The substation No 369, Lenenergo
- The substation No 357, St. Petersburg Electric Networks
- The substation No 535, Lenenergo
- The substation No 73, Pskovenergo
- The substation No 92, Kashkarancy, Kolenergo
Oil and gas industry
- Khabarovsk Oil Refinery
- Gas pipeline: Return Pskov - Pitalovo
- Achinsk Oil Refinery
- Сathodic station Russkaya
- Сathodic station Kazachiya